142 Road & Construction Engineers Group: Construction and Installation Inc. Graded (new version) by organization of Programming and Budget as the first in construction and second in mechanical installation

 
Projects title:  Suppoting Site of Central Support 2
Employer: Pars Energy Co.  Consultant & supervisor:

 Rah Shahr Consulting Engineers Company


Project Identity Card
1- Place of Execution :  Port Asalouyeh - Boushehr province
2- Application :  Services
3- Commencement Date : 2004
4- Provisional Delivery :  
5- Final Delivery :  
6- Land Measurement : 36000 square meter
7- Infrastructure :  6000 square meter
8- Type of Contract :  Construction & Installation
9- Price of Contract :  32 billion Rials
10- Terms of Payment :  Base list 1383



 
General Specifications of Project

 Projects structures:

  1. Emergency building with infrastructure of 530 square meters in a single floor. It has a bolt metal structure, composite ceiling and sheetrock panels as walls.
  2. Official building has 2550 square meters infrastructure, bolt metal structure, composite ceiling and drival walls.
  3. Fire fighting in 1100 m2 area, single story, all structure, ceiling and walls are made of armed concrete.
  4. Mosque has 500 infrastructure, single story, metal structure, composite ceiling, and sheetrock panels.
  5. Mayoralty building is an 1150 square meter burrow. Constructed as a central bore with two metal structures on the side.
  6. Reinforcement hall with 3000 infrastructure constructed as a tent.

Common specifications:
 False ceilings are composite of dampa, plastered panels and covered concrete. Mostly 30x30 Iranian tiles, Chinese stone, travertine and alabasters 40x40 and ceramics with different dimensions cover floors.
 Walls covers are composed of Centex, Oil paint and tiles. Most of windows and doors are of PVC while outer windows have double glass (16mm color + 4mm white).
Split air conditioning system and package units provided for the buildings air conditioning. The fire alarm, fire fighting, central phone, paging and LAN systems are embedded in the buildings as well.
 Subsidiary buildings and installations are designed in the site to support main buildings of the complex. The installations are Electrical posts, diesel generator, above ground water tank, backup tanks and water pressure control system plus drainage refinement system.