Projects title:  224-bed hospital of Arak
Employer:

 Ministry of Housing and urban Development

Consultant & supervisor:

 Leyman Consulting Engineers Company


Project Identity Card
1- Place of Execution :  Arak
2- Application :  Educational
3- Commencement Date : 2002
4- Provisional Delivery :  
5- Final Delivery :
6- Land Measurement : 39000 square meter 
7- Infrastructure : 17000 square meter
8- Type of Contract : Construction 
9- Price of Contract :  21.5 billion Rials
10- Terms of Payment : Base List 1380 

 


 
General Specifications of Project
 This hospital has been constructed in the suburb of Andimeshk with the infrastructure of 18000 square meter in three floors. All the constructional operation of the hospital and residential apartments of the physicians (6 residential apartments) have been executed by 142 company and the installations operations of the project have been fulfilled by shabakeh pars and heat land companies.

The structure and ceiling of this hospital are concrete and separating walls are have been constructed with engineering bricks. The façade has been constructed with prefabricated concrete parts for the bowers above windows and aluminum doors and windows. Interior design of the hospital is a combination of paint, tile, cement, plaster and stones on the walls and ceramic, stone and finishes on the floor and plaster panels and Dampa on the ceiling.

This hospital includes the following wards: Hospitalization, Surgical operations, medical diagnosis, support service and administrative services.
Moreover , the landscape of the hospital, there are auxiliary and support building as well as 6 residential two-bedroom apartments for the physicians.