142 Road & Construction Engineers Group: Construction and Installation Inc. Graded (new version) by organization of Programming and Budget as the first in construction and second in mechanical installation

 
Projects title:  Shahroud 256-bed Hospital
Employer:  Social Security Organization Consultant & supervisor:  Khaneh sazi Iran Company


Project Identity Card
1- Place of Execution :  Shahroud – Semnan Province
2- Application :  Genera Hospital
3- Commencement Date : 1991
4- Provisional Delivery : 1998 
5- Final Delivery :  
6- Land Measurement : 120000 square meter
7- Infrastructure :  25,5 square meter
8- Type of Contract :  Constructional-Installations
9- Price of Contract : 18,000,000,000 Rls 
10- Terms of Payment : According to the price list of Budget and Planning Organization in 1991 

   

   
General Specifications of Project
 This hospital has been constructed in suburb of the city, with an infrastructure of 25500 square meter in ttwo floors. All constructional and installations and non-medical equipment operations of the hospital have been executed by the 142 company. The hospital structure and ceiling are concrete and separating walls have been made with bricks. The façade has been made with brick and prefabricated concrete parts and aluminum doors and windows. Interior design of the hospital has been made with a combination of stone, plaster, paint and tile on walls and floors with plastic floor finish.

Air conditioner of the hospital includes radiators, floor ceiling and canal fan coils as well as 9 air handing units and a Zent whose chilling or heating fluid is supplied in the central engine room by three 10000-pound boilers and four 130-ton chillers. Discharge and refreshment of the hospital air is fulfilled by 101 ceiling ventilators on the roof of the hospital. Non-medical equipment of the hospital mainly includes all tables and desks, shelves, table and desks of laboratory, laboratory hoods, devices and equipment of kitchen and refrigerators.
This hospital includes the following wards:

A- Hospitalization wards:
1- Gynecology (70bed)
2- Internal Diseases (86bed)
3- Surgery (67bed)
4- Pediatrics (33bed)
5- ICU
6- CCU
7- Newborns
8- Surgical Operations-(six operation rooms)
9- Labor Operaions – (two operation room)
10- Clinic

B-Dignostic Service Ward:
1- Medical Laboratory
2- Radiology
3- Indoscopy
4- Physiotherapy

C-Support service ward
1- sterilization Center
2- Pharmacy
3- Laundry Room
4- General and foodstuff warehouses
5- Corpse Cold Room and Anatomy Room
6-Installations (Engine Room and Elevator)
7- Kitchen

D- Administrative Services:
1- Management
2- Accounting and Financial Section
3- Reception
4- Conference Saloon
5- Library

Auxiliary and Support Buildings:
1- Guarding
2- Garbage Burning Room (two garbage burners, each with the capacity of 100 kg.)
3- Repairs and drivers rooms
4- Sewage water treatment
5- Water reservoir and water pumping station
6- Generator room (two 270-kilowatt diesel generators)
7- Private 20-kilowatt electrical post
8- Transformer room (two 1250-KVA transformers)
9- Gas Pressure Reduction Station