Projects title: Sirjan 160-bed Hospital (Shahid Dr.Gharzi)
Employer: Social Security Organization Consultant & supervisor: Khaneh sazi Iran Company 


 

Project Identity Card
1- Place of Execution : Sirjan - Kerman Province
2- Application : Genera Hospital
3- Commencement Date : 1987
4- Provisional Delivery : 1992
5- Final Delivery : 1993
6- Land Measurement : 105000 square meter
7- Infrastructure : 15 square meter 
8- Type of Contract : Constructional-Installations 
9- Price of Contract : 6,000,000,000 Rls 
10- Terms of Payment : According to the price list of Budget and Planning Organization in 1991 


  

  
General Specifications of Project
 This hospital has been constructed in an appropriate place in terms of location and main streets, with an infrastructure of 15000 square meter in one floor in addition to 1 floor and half for administrative affairs. All constructional and installations operations of the hospital have been executed by the 142 Company. The hospital structure and ceilings are concrete and separating walls have been made with bricks. The façade has been made with brick and prefabricated concrete parts and aluminum doors and windows. Interior design of the hospital has been made with a combination of stone,plaster,paint and tile on walls and floor with plastic floor finish.

Air conditioner of the hospital includes radiators, ceiling and canal fan coils as well as 5 air handling units and two chilling or heating fluid is supplied in the central engine room by three 6500-pound boilers boilers and four 160-ton chillers. Discharge and refreshment of the hospital air is fulfilled by 87 ceiling ventilators on the roof of the hospital.
This hospital includes the following wards:

A- Hospitalization wards:
1- Gynecology (32bed)
2- Internal Diseases (48bed)
3- Surgery (48bed)
4- Pediatrics (32bed)
5- ICU
6- CCU
7- Newborns
8- Surgical Operations-(four operation rooms)
9- Labor Operaions – (two operation room)
10- Clinic

B-Dignostic Service Ward:
1- Medical Laboratory
2- Radiology
3- Indoscopy
4- Physiotherapy

C-Support service ward
1- sterilization Center
2- Pharmacy
3- Laundry Room
4- General and foodstuff warehouses
5- Corpse Cold Room and Anatomy Room
6-Installations
7- Kitchen

D- Administrative Services:
1- Management
2- Accounting and Financial Section
3- Reception
4- Conterence Saloon
5- Library

Auxiliary and Support Buildings:
1- Guarding
2- Garbage Burning Room (two garbage burners, each with the capacity of 100 kg.)
3- Repairs and drivers rooms
4- Sewage water treatment
5- Water reservoir and water pumping station
6- Generator room (two 270-kilowatt diesel generators)
7- Private 20-kilowatt electrical post
8- Transformer room (two 1000-KVA transformers)