142 Road & Construction Engineers Group: Construction and Installation Inc. Graded (new version) by organization of Programming and Budget as the first in construction and second in mechanical installation

 
Projects title:  Construction of factory
Employer:  Iranian Rehabilitation industries Company Consultant & supervisor:

 Technical Bureau of Development Center of Tehran


Project Identity Card
1- Place of Execution :  Ghazvin – Alborz Industrial City
2- Application :  Producing Factory
3- Commencement Date : 1981
4- Provisional Delivery : 1982
5- Final Delivery : 1983 
6- Land Measurement : 5000 square meter
7- Infrastructure : 2000 square meter  
8- Type of Contract : Constructional-Installations 
9- Price of Contract :  40,000,000 Rls
10- Terms of Payment :  According to the price list of Budget and Planning Organization



 
General Specifications of Project
 Construction operations of the factory building were executed in a land measuring 5000 square meter in Alborz Industrial City, aimed to produce the equipment required by the handicapped, in 1981.This factory includes the saloons of raw materials and production. In the landscape of the factory, an administrative building measuring about 200 square meter and a residential (house keeping) building measuring 100 square meter has been constructed. The saloons have been constructed with slope frames and the ceilings with asbestos sheets covered with wool glass and aluminum.

All related machinery have been installed on the foundation in addition to execution of all installation required by the factory.